Spire Hospital

  • Client: Spire Hospital
  • Manager: Alan Sheppard
  • Location: Bristol
  • Project Duration: On going

Works carried out:

Refurbishment of existing lighting. Replacement with LED lighting for cost saving in energy consumption and savings on maintenance.

Carry out Inspection and Testing of fixed wiring systems to ensure safety and compliance of Installations.

Minor and major fault rectification work to various electrical faults.

New installations from electrical sub mains and distribution boards to installing new circuits, light fittings and equipment.